Figures instead of names.

Ten examples from 2026, anonymised by project type, region, service, scope and volume.

Request without an account, confidentiality first

Ten projects at a glance

Sector Healthcare2026
€5 millionLot volume, net

New healthcare building, structural work

Region
Northern Germany
Service
Bid estimating, structural work
Scope
700+ items
Sector Infrastructure2026
€4.8 millionLot volume, net

Repair of concrete carriageway

Region
Northern Germany
Service
Bid estimating
Scope
100+ items
Sector Healthcare2026
€3.5 millionLot volume, net

Additional storeys on a healthcare building, structural work

Region
Northern Germany
Service
Bid estimating, structural work
Scope
700+ items
Sector Education2026
€0.9 millionLot volume, net

Day nursery, earthworks, concrete and masonry works

Region
Schleswig-Holstein
Service
Bid estimating with quantity take-off
Scope
149 items
Sector Infrastructure2026
€0.7 millionLot volume, net

Road building, asphalt

Region
Lower Saxony
Service
Bid estimating
Scope
114 items
Sector Education2026
€0.7 millionLot volume, net

Primary school extension, canteen

Region
Lower Saxony
Service
Bid estimating, structural work
Scope
271 items
Sector Demolition2026
€0.5 millionLot volume, net

Demolition of an existing building

Region
Northern Germany
Service
Estimate for a subcontractor as bidder
Scope
90 items, rounded
Sector Infrastructure2026
€0.4 millionLot volume, net

Framework agreement, scaffolding

Region
Northern Germany
Service
Bid estimating, scaffolding
Scope
100 items, rounded
Sector Residential2026
16trades

New-build town villa

Region
Hamburg
Service
Quantity take-off for a construction company
Scope
341 items
Sector Residential2026
severalinterim payment applications

Refurbishment of a residential building

Region
Northern Germany
Service
Scaffolding billing for a scaffolding contractor

All details anonymised, volumes rounded and net. The volume is the lot we estimated, not BauPragma's turnover. We do not state contract awards.

BauPragma in figures

70+Bids estimated
7,400+Bill of quantities items estimated
up to about€5millionLots, net

An example from billing

This is what an interim payment application prepared by us looks like, here as a sample with invented figures.

Every item supported

Every line comes with a quantity survey and evidence. That is what the client checks against.

Sample
Muster Bau GmbHMusterstraße 120000 Musterstadt

Interim payment application no. 2

Item no.DescriptionQtyUnitUnit priceAmount €
02Demolition works
02 0 0010Demolish masonry, t = 24 cm72,40m³118,008.543,20
02 0 0040Create wall opening, external wall16pcs86,001.376,00No measurement: 8 pcs
Total 02 Demolition works9.919,20
04Masonry works
04 0 0020Calcium silicate masonry, t = 17,5 cm540,00m²62,0033.480,00
04 0 0050Lintel, precast22pcs98,002.156,00No evidence: 9 pcs
Total 04 Masonry works35.636,00
Invoice total, net45.555,20
Reduced for missing evidence1.962,00 €
Sample for illustration, not a real invoice. Red marks the items a reviewer reduces. Amounts and quantities are in German number format (comma as decimal separator).

Red: where the reviewer cuts

Wall openings without measurement, lintels without evidence. The checker only accepts what he counts himself; the difference is in the reduced total.

Two cases from our invoicing

From our 2026 sites, without names. Amounts rounded and net.

Additional quantity

approx. €10,500

Additional quantity without a dispute

Instead of the 80 m² of protective wall in the bill of quantities, around 600 m² were needed. We invoiced the additional quantity with a measurement under the existing item. The client confirmed this in writing, without a variation order.

Site in Hamburg

Check recalculated

approx. €12,700

Calculation error in the check

In a checked interim invoice, one item stood at €506.60 instead of €13,220.40. We recalculate every check, line by line. In the following check, the full amount is included.

Shell construction in Hamburg

Frequently asked questions

Why are the references anonymous?

We do not name clients or projects without their approval. You see project type, region, service, scope and year.

What does the volume on the cards mean?

It is the rounded net total of the lot we estimated. It does not equal BauPragma's turnover.

Do you state contract awards or prices?

No, the cards show the service, scope and estimated volume, not the outcome of the procedure.

Do you also estimate for other bidders?

Yes, for example a demolition, estimated for a subcontractor as bidder. Most of our estimates are bids for public tenders.

Your invoice next.

Describe your request to us. We will get back to you within three working days.

In a hurry? 040 52 474 089 (Mon–Fri 8am–4pm)