Interim payment applications the reviewer accepts.

We prepare your interim payment application from the contract and the bill of quantities. Every item with quantity survey and evidence.

Request without an account, confidentiality first

Sample
Muster Bau GmbHMusterstraße 120000 Musterstadt

Money Check: result on one page

  • 02 0 0040Quantity: The measurement is missing. Without it, the checker counts for himself and reduces the quantity.
  • 04 0 0050Evidence: There is no evidence for the number of pieces. We tell you what needs to be provided.
  • 05 0 0010Item: In the bill of quantities, but not included in the invoice.
Points needing action3

If nothing is missing, that is stated there too.

Sample for illustration, not a real invoice.

Every 14 days

Every 14 days, or as your payment schedule requires, one interim payment application per construction site, cancellable at the end of the project.

SurveyInvoiceReviewPayment14 days

What we do for you

Items as in the bill of quantities

Quantity, unit price and amount for every line, with subtotals per section.

Quantity survey

The quantity survey that supports the quantities is enclosed.

Evidence

Delivery notes, plans and photos for every item. If something is missing, we ask specifically instead of guessing.

Invoice summary

Cumulative progress, less amounts already invoiced, and net amount payable.

Every quantity has a calculation

This is what the calculation for two items looks like. Example values, schematic: floor plan 12.00 × 8.00 m, strip foundations 0.50 × 0.80 m, working space 0.50 m on each side, slope 45°.

12.00 m8.00 mStrip foundation

01 0 0010 Excavation of foundation trenches

Axis 2 × (11.50 + 7.50) = 38.00 m

Trench bottom 0.50 + 2 × 0.50 = 1.50 m, top 1.50 + 2 × 0.80 = 3.10 m

(1.50 + 3.10) / 2 × 0.80 = 1.84 m²

38.00 × 1.84 = 69.92 m³

02 0 0010 Reinforced concrete C25/30

Strip foundations 15.20

Slab 12.00 × 8.00 × 0.25 = 24.00

Upstand 39.00 × 0.25 × 0.40 = 3.90

total 43.10 m³

Two cases from our invoicing

From our 2026 sites, without names. Amounts rounded and net.

Additional quantity

approx. €10,500

Additional quantity without a dispute

Instead of the 80 m² of protective wall in the bill of quantities, around 600 m² were needed. We invoiced the additional quantity with a measurement under the existing item. The client confirmed this in writing, without a variation order.

Site in Hamburg

Check recalculated

approx. €12,700

Calculation error in the check

In a checked interim invoice, one item stood at €506.60 instead of €13,220.40. We recalculate every check, line by line. In the following check, the full amount is included.

Shell construction in Hamburg

From the Money Check to fixed billing

1Confidential

Money Check

You describe your request to us, without documents. The review with your documents follows once the non-disclosure agreement (NDA) is signed. Three working days after we receive the complete documents, you receive the result and an offer with a price.

For construction companies with a unit price contract, orders from EUR 200,000 net.

2Pilot

One construction site

The next interim payment application with quantity survey, on your letterhead. You check and send it yourself.

Fixed price, stated in writing before we start. You pay only if you use the invoice.

3Fixed price

Per interim payment application

Every interim payment application at a fixed price, billed according to your payment schedule, cancellable at the end of the project.

The fixed price depends on the number of items, daywork and on-site quantity survey, and is set before we start.

If the reviewer cuts an item we prepared because of missing evidence, we correct it free of charge.

We give no guarantee that your client will pay.

How it works

  1. 1
    Day 0

    Your enquiry

    You describe your request in the form; we do not need any documents yet.

  2. 2
    by day 3

    Reply

    We look at your request and get back to you by phone or email.

  3. 3

    Agreement

    If your request is a fit for us, you receive our non-disclosure agreement (NDA) to sign.

  4. 4

    Your documents

    Only after signing do you send us the interim payment application, contract, bill of quantities and quantity survey. You then receive our result and an offer with a price.

What we need

You send us these documents as soon as the non-disclosure agreement (NDA) is signed.

Contract bill of quantities

Contract with payment schedule

Your latest interim payment application

Quantity survey

Plans with index

Delivery notes for concrete and steel

Send the documents by email to info@baupragma.de; we exchange large files through a SharePoint link that we send you.

Frequently asked questions

Do the letterhead and dispatch stay with you?

Yes. The invoice carries your letterhead and your logo. You check, sign and send it yourself. We take the writing off your hands, not the decision.

What happens if the reviewer cuts the amount?

If the evidence for an item we prepared is missing, we correct it free of charge. We cannot guarantee that your client will pay.

Do prices and documents stay confidential?

Yes. You send us your documents only once you have signed our non-disclosure agreement. On a construction site we work for one side only.

What does the billing cost?

We work with a fixed price per interim payment application. It depends on the scope and is set in writing before we start. For the pilot construction site you pay only if you use the invoice.

What do you need from the foreman?

Delivery notes, timesheets and photos of the work carried out, where they exist on site. If a document is missing for an item, we ask specifically instead of guessing.

Your interim payment application. Every 14 days.

Describe your request to us. We will get back to you within three working days.

In a hurry? 040 52 474 089 (Mon–Fri 8am–4pm)